Loading...
Loading...
siemens-energy-and-air-liquide-gw-scale-electrolyser-factory-begins-operations
siemens-energy-and-air-liquide-gw-scale-electrolyser-factory-begins-operations

Siemens Energy and Air Liquide GW-scale electrolyser factory begins operations

Siemens Energy and its partner Air Liquide have announced the opening of its multi-gigawatt electrolyser factory in Berlin, Germany.

By 2025, the two companies expect the facility to boast at least 3GW of electrolysis capacity per year and brought to market.

The factory will manufacture a series production of electrolyser stacks beginning with 1GW in 2023, 2GW in 2024 and 3GW by 2025, and it will utilise innovative automation and digitalisation technology.

Siemens and Air Liquide signed entered a joint venture last year (2022), which was designed to lay the foundations for a ramp up in electrolysis capacity, with the aim of making cost competitive hydrogen more widely available.

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To gain access to this article and all our other content, you will need to subscribe to H2 View.

From the latest print editions, to 24/7 online access to exclusive interviews, authoritative columnists and the H2 View news archive, a subscription is the best way for you to stay up to date with developments in the hydrogen community.

Please wait...