Shell Deutschland has signed a capacity reservation of 100MW with ITM Power for its PEM electrolyser stacks for hydrogen production in Rhineland, Germany.
Set to be manufactured between 2025 and 2026, the 100MW of TRIDENT stacks are planned for use at Shell’s Refhyne 2 project.
The project will see a PEM electrolyser installed at the Shell Rhineland Energy and Chemicals Plant in Germany. The electrolyser will use renewable power to produce green hydrogen which will help decarbonise the plant’s refinery operations.
... to continue reading you must be subscribed