Loading...
Loading...
rwe-commissions-14mw-electrolysis-plant-and-begins-hydrogen-production
© RWE
rwe-commissions-14mw-electrolysis-plant-and-begins-hydrogen-production
© RWE

RWE commissions 14MW electrolysis plant and begins hydrogen production

RWE has commissioned its 14MW pilot electrolyser at its hydrogen production plant in Lingen, Germany, just days after it announced plans for a refuelling station at the Emsland gas-fired power plant.

The pilot electrolyser consists of two sub-systems – a 10MW alkaline electrolyser provided by Sunfire and a 4MW plant designed and built by Linde using an ITM Power PEM electrolyser.

Having already produced its first kilogrammes of hydrogen in September last year, the plant is now expected to be capable of generating up to 270kg of green hydrogen per hour via electrolysis powered by renewable sources.

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To gain access to this article and all our other content, you will need to subscribe to H2 View.

From the latest print editions, to 24/7 online access to exclusive interviews, authoritative columnists and the H2 View news archive, a subscription is the best way for you to stay up to date with developments in the hydrogen community.

Please wait...