Loading...
Loading...
poshydon-begins-testing-ahead-of-offshore-hydrogen-production-in-q4
© Nel Hydrogen / PosHYdon
poshydon-begins-testing-ahead-of-offshore-hydrogen-production-in-q4
© Nel Hydrogen / PosHYdon

PosHYdon begins testing ahead of offshore hydrogen production in Q4

The PosHYdon pilot project has started onshore testing for the first time at InVesta’s facility in Alkmaar, the Netherlands.

Following the onshore testing period, the electrolyser will be transferred offshore to the Q13a-A platform, 13km off the coast of Scheveningen, The Hague. The first offshore production of hydrogen is expected in Q4 2024.

The pilot aims to produce green hydrogen on an operational gas platform, with three offshore energy systems integrated to allow for the transport of hydrogen and gas to land via an existing pipeline. The facility is capable of converting seawater into demineralised water to produce hydrogen via electrolysis.

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To gain access to this article and all our other content, you will need to subscribe to H2 View.

From the latest print editions, to 24/7 online access to exclusive interviews, authoritative columnists and the H2 View news archive, a subscription is the best way for you to stay up to date with developments in the hydrogen community.

Please wait...