Nel Hydrogen Electrolyser has today (19th Jan) launched two new containerised Proton PEM electrolysers.
MC250 and MC500 (pictured above) will be delivered as standard 1.25 and 2.5MW (246 and 492 Nm3/h) configurations respectively, the Nel ASA subsidiary said.
The new products are integrating Nel’s newly developed 1.25MW PEM cell-stack, allowing for higher capacities per unit and lower cost.
The platform allows multiple units to be integrated easily in the field, which was a key consideration during the development.
... to continue reading you must be subscribed