Loading...
Loading...
iperionx-installs-125tpa-hydrogen-powered-titanium-furnace
© IperionX
iperionx-installs-125tpa-hydrogen-powered-titanium-furnace
© IperionX

IperionX installs 125tpa hydrogen-powered titanium furnace

IperionX has successfully delivered and installed its Hydrogen Assisted Metallothermic (HAMR™) titanium furnace at its facility in Virginia, the US.

Located at the new Titanium Manufacturing Campus, the furnace – resembling a standard Kroll titanium furnace – enhances lower operating temperatures, increased efficiencies, shorter production cycles and higher product qualities.

The construction and development of the campus is advancing to schedule, whilst the commissioning of the HAMR furnace is scheduled for Q2 2024, along with the first titanium powder expected in mid-2024.

IperionX anticipates a full run rate target capacity of at least 125 tonnes per year by the end of 2024, before scaling up to a full target production capacity of 2,000 tonnes per year in 2026.

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To gain access to this article and all our other content, you will need to subscribe to H2 View.

From the latest print editions, to 24/7 online access to exclusive interviews, authoritative columnists and the H2 View news archive, a subscription is the best way for you to stay up to date with developments in the hydrogen community.

Please wait...