Loading...
Loading...
hydrogen-ready-anode-furnaces-installed-at-aurubis-hamburg-cooper-plant
© Aurubis
hydrogen-ready-anode-furnaces-installed-at-aurubis-hamburg-cooper-plant
© Aurubis

Hydrogen-ready anode furnaces installed at Aurubis’ Hamburg cooper plant

Hydrogen-ready anode furnaces for copper refining have been installed at German non-ferrous metal supplier Aurubis’ Hamburg plant, after the largest maintenance shutdown in the site’s history.

These installations are part of a wider €95m maintenance and upgrade programme aimed at improving the plant’s efficiency and sustainability.

The new furnaces, which represent a €40m investment, will be able to run entirely on hydrogen, natural gas or a blend of the two.

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To gain access to this article and all our other content, you will need to subscribe to H2 View.

From the latest print editions, to 24/7 online access to exclusive interviews, authoritative columnists and the H2 View news archive, a subscription is the best way for you to stay up to date with developments in the hydrogen community.

Please wait...