Loading...
Loading...
black-veatch-to-lead-feed-study-on-verdagys-9000-tpa-hydrogen-plant
Electrolyser factory © Verdagy
black-veatch-to-lead-feed-study-on-verdagys-9000-tpa-hydrogen-plant
Electrolyser factory © Verdagy

Black & Veatch to lead FEED study on Verdagy’s 9,000 tpa hydrogen plant

Global engineering and consulting company Black & Veatch will undertake front-end engineering and design (FEED) studies for Verdagy’s 9,000-tonne-per-year clean hydrogen project.

According to Verdagy’s online statement, Black & Veatch is set to complete FEED by May 2025 for the Texas-based initiative near the Gulf Coast, US. This will pave the way for an expected final investment decision (FID) in July 2025.

The project will use Verdagy’s eDynamic electrolysers to produce hydrogen compliant with Europe’s Renewable Fuels of Non-Biological Origin (RFNBO) standards and 45V US Treasury requirements.

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To gain access to this article and all our other content, you will need to subscribe to H2 View.

From the latest print editions, to 24/7 online access to exclusive interviews, authoritative columnists and the H2 View news archive, a subscription is the best way for you to stay up to date with developments in the hydrogen community.

Please wait...