Loading...
Loading...
arena-backs-vasts-green-methanol-production-plant-in-port-augusta
Vast Solar 1 project © Vast Renewables
arena-backs-vasts-green-methanol-production-plant-in-port-augusta
Vast Solar 1 project © Vast Renewables

ARENA backs Vast’s green methanol production plant in Port Augusta

Vast Renewables Limited has secured up to AUD 180m ($113m) in conditional funding for the construction of its Port Augusta clean energy project, which will include a hydrogen-based green methanol plant.

Awarded by the Australian Renewable Energy Agency (ARENA), the Vast Solar 1 (VS1) initiative is part of the Port Augusta Green Energy Hub and includes an option to power a co-located green methanol production facility called Solar Methanol 1 (SM1).

Set to be developed in partnership with German company Mabanaft, SM1 will produce green methanol derived from hydrogen in South Australia.

Overall, the Australian project will utilise Vast’s next-generation concentrated solar thermal power (CSP) technology to provide long-duration renewable energy storage and generation to supply on-demand clean power to South Australia’s grid.

… to continue reading this article and more, please login, register for free, or consider subscribing to H2 View

Register today

Paywall Asset Header Graphic

You’ve reached your weekly limit to access free articles!

Want to keep reading?

Please register for free and create a profile to gain access to this full article and H2 View’s daily news.

For access to more content including our monthly digital magazines, subscriber-only features or columns and all our other H2 View archives, please consider subscribing.

Alternatively, you can continue reading more articles as a guest on Tuesday, 18th March at 5:30AM

Please wait...