Loading...
Loading...
agp-europe-starts-hydrogen-production-to-achieve-20-blend-in-glass-manufacturing
© Ardagh Group [LinkedIn]
agp-europe-starts-hydrogen-production-to-achieve-20-blend-in-glass-manufacturing
© Ardagh Group [LinkedIn]

AGP-Europe starts hydrogen production to achieve 20% blend in glass manufacturing

Ardagh Glass Packaging (AGP)-Europe has begun producing green hydrogen for glass melting via a 5MW electrolyser at its facility in Limmared, Sweden.

Via the proton exchange membrane (PEM), AGP-Europe supplies hydrogen to the energy mix in its glass furnace, with the target of eventually achieving a 20% hydrogen blend.

Since they initiated electrolyser testing in October (2024), the furnace has reportedly combusted 109,000m3 of hydrogen onsite, saving up to 70 tonnes of carbon dioxide (CO2).

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To gain access to this article and all our other content, you will need to subscribe to H2 View.

From the latest print editions, to 24/7 online access to exclusive interviews, authoritative columnists and the H2 View news archive, a subscription is the best way for you to stay up to date with developments in the hydrogen community.

Please wait...