Loading...
Loading...
70-of-the-current-green-hydrogen-project-pipeline-are-situated-in-water-stressed-areas-says-rystad-energy
70-of-the-current-green-hydrogen-project-pipeline-are-situated-in-water-stressed-areas-says-rystad-energy

70% of the current green hydrogen project pipeline are situated in water-stressed areas, says Rystad Energy

According to research by Rystad Energy, although the green hydrogen project pipeline is growing at an unprecedented pace, many of the projects are situated in regions with high water-stress levels.

Due to the majority of planned projects falling in areas with low water supplies, Rystad has suggested that an additional desalination market will need to be created to produce most of the 620 million cubic meters of water required for these projects.

Read more: Rystad Energy: Green hydrogen plans already top 60GW
Read more:
Hydrogen production from salt and polluted water

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To gain access to this article and all our other content, you will need to subscribe to H2 View.

From the latest print editions, to 24/7 online access to exclusive interviews, authoritative columnists and the H2 View news archive, a subscription is the best way for you to stay up to date with developments in the hydrogen community.

Please wait...